{"id":122435,"date":"2018-12-14T07:15:09","date_gmt":"2018-12-14T07:15:09","guid":{"rendered":"http:\/\/www.atvtoday.co.uk\/?p=122435"},"modified":"2018-12-14T07:15:09","modified_gmt":"2018-12-14T07:15:09","slug":"122435-bbc","status":"publish","type":"post","link":"https:\/\/atvtoday.co.uk\/newsarchive\/2018\/12\/14\/122435-bbc\/","title":{"rendered":"EastEnders external set replacement to cost \u00a386.7 million"},"content":{"rendered":"<h4 style=\"text-align: center;\">The Beeb&#8217;s low-rating saga is having a high spending spree as the Albert Square replacement will cost \u00a327 million more than planned.<\/h4>\n<p><!--more--><\/p>\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-94416\" src=\"http:\/\/www.atvtoday.co.uk\/wp-content\/uploads\/2017\/03\/EastEnders-chippy-destroyed.jpg\" alt=\"\" width=\"874\" height=\"339\" \/><\/p>\n<h5 style=\"text-align: center;\"><em>The Beeb have suggested that the Elstree exterior is virtually falling down, unfit for purpose.<\/em><\/h5>\n<blockquote><p>&#8220;While the &#8216;Enders set is obviously &#8216;not fit for purpose&#8217; some may suggest neither is the programme currently, time to invest in writers and decent storyliners rather than fancy bricks&#8221; &#8211; TV Critic Vivian Summers<\/p><\/blockquote>\n<p style=\"text-align: justify;\"><span style=\"font-family: verdana, geneva, sans-serif;\">As part of a program entitled <em>E20<\/em> the corporation announced in 2013 <\/span>it<span style=\"font-family: verdana, geneva, sans-serif;\"> intended to replace the 1984-built Albert Square and surrounding backlot exteriors for<em> EastEnders. <\/em>The scheme would also, the Beeb noted, improve various infrastructures at BBC Elstree Centre &#8211; which opened as a television facility in 1961 &#8211; however parts of the complex go back over 100 years when the site opened as the Neptune Film Studios in 1914.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-family: verdana, geneva, sans-serif;\">This week the National Audit Office forecast the plans will go \u00a327 million over the original forecast budget. It isn&#8217;t just finance that has exceeded expectations; with the rebuild now taking an additional two and a half years to complete. In its report, the National Audit Office concludes that the BBC will not be able to deliver value for money on the <em>E20<\/em> programme in the way that it envisaged in 2015.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-family: verdana, geneva, sans-serif;\">The BBC built the external filming set for <em>EastEnders<\/em> on a backlot that had been used for several other production including the land\u00a0 used for a replica of The Globe Theatre for a lavish <em>William Shakespeare<\/em> drama starring Tim Curry, an Olde English village for a Bing Crosby festive special <em>Merry Olde Christmas<\/em>, an East End market street for 1960s soap opera <em>Honey Lane<\/em> (the first specially built external set for a UK serial) and an industrial late-1800s town in <em>Clayhanger<\/em>. It&#8217;s final use before &#8216;<em>Enders<\/em> arrived was for Central Television&#8217;s <em>Auf Wiedersehen, Pet<\/em>, which saw the land home to a German-based building site.<br \/>\n<\/span><\/p>\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-104593\" src=\"http:\/\/www.atvtoday.co.uk\/wp-content\/uploads\/2017\/08\/EastEnders-Queen-Vic-fire-1992.jpg\" alt=\"\" width=\"874\" height=\"339\" \/><\/p>\n<h5 style=\"text-align: center;\"><em>The Queen Vic Pub structure has survived a couple of fires, car crashes and Peggy Mitchell&#8217;s howling.<\/em><\/h5>\n<p style=\"text-align: justify;\"><span style=\"font-family: verdana, geneva, sans-serif;\">The BBC Elstree Studios were originally converted for TV production for ITV programming by ATV Network in 1958. The original <em>EastEnders<\/em> blacklot set followed the same format of the previous structures &#8211; in as much it was built only for a short-term plan, with the Beeb not envisaging it being still standing after two years &#8211; the frontages have stood for 34 years.<br \/>\n<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-family: verdana, geneva, sans-serif;\">The NAO <\/span>go<span style=\"font-family: verdana, geneva, sans-serif;\"> on to note that the &#8216;poor condition of the set means the BBC cannot film in high-definition, degradation has led to increasing filming delays owing to stoppages in production due to health and safety concerns, and there are ongoing maintenance costs to ensure filming can continue.&#8217;<\/span><\/p>\n<blockquote>\n<p style=\"text-align: justify;\">\u201cThe BBC will not be able to deliver value for money on E20 in the way that it originally envisaged. It is surprising that some of the reasons for this were built in from the beginning. Despite recent project management improvements, E20 is late and over budget against its 2015 plans. We believe that the planned benefits are still broadly achievable, but given the high-risk nature of E20 it will need close scrutiny until it is finished.\u201d &#8211; Amyas Morse, head of the NAO<\/p>\n<\/blockquote>\n<p style=\"text-align: justify;\"><span style=\"font-family: verdana, geneva, sans-serif;\">In 2013, the BBC proposed building a temporary set, two-thirds of the size of the existing external filming site, to use while it constructed a new permanent set. It expected <em>E20<\/em> to cost \u00a359.7 million and to be completed by August 2018. Due partly to forecast cost increases, the BBC substantially revised its plans in 2015, moving its target completion date to October 2020. The case for <em>E20<\/em> and the rationale for the current approach is clear the body note. However, in October 2017, the Beeb reported internally that its revised plans were no longer achievable due to forecast delays and cost increases.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-family: verdana, geneva, sans-serif;\">As a result more realistic plans now see the corporation forecasting that <em>E20<\/em> will cost \u00a386.7 million \u2013 45% more than the original budget. Most of this increase relates to the higher cost of the Front Lot, which the BBC now estimates will cost \u00a354.7 million \u2013 \u00a323.5 million (75%) more than planned. Following negotiation and clarification around the Front Lot construction contract, including the type and supply of bricks required, Wates was appointed by the BBC in September 2018 to carry out the work at a fixed price of \u00a324.2 million, \u00a39.5 million more than the BBC budgeted in October 2015. The BBC expects the Front Lot to be completed at the end of March 2021, 22 months later than originally planned.<\/span><\/p>\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-100316\" src=\"http:\/\/www.atvtoday.co.uk\/wp-content\/uploads\/2017\/07\/elstree.jpg\" alt=\"\" width=\"874\" height=\"339\" \/><\/p>\n<h5 style=\"text-align: center;\"><em>The BBC Elstree Centre, back in 1961 when it opened for TV production as the ATV Elstree Centre.<\/em><\/h5>\n<p style=\"text-align: justify;\"><span style=\"font-family: verdana, geneva, sans-serif;\">The Beeb now intends for <em>E20<\/em> to be completed in May 2023 \u2013 31 months later than envisaged in its 2015 plans. Delays have come from contract negotiations as well as creative discussions on the lot look. The overall forecast delay, which includes contingency time, is additional and separate to the 26 months the NAO reported in 2016.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-family: verdana, geneva, sans-serif;\">By the end of September 2018, the BBC had spent \u00a328.2 million and completed various elements of E20, though much of this work has cost more and taken longer than planned. In October 2018, the BBC began constructing the Front Lot, the most challenging part of E20, and the Back Lot was at an early design stage. The Beeb expects to realise the intended benefits of E20, albeit at a later date and greater cost than originally planned.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-family: verdana, geneva, sans-serif;\">The NAO went on to note that they &#8216;consider some of the reasons for the delays and cost increases could have been addressed earlier by the BBC. Early planning processes resulted in the BBC underestimating aspects of complexity, cost and risks of its approach. There was also insufficient construction project management expertise to identify critical design issues, for example with the Front Lot. Furthermore, while they did engage with each other, the programme team and EastEnders production (the end users of the set) were not sufficiently integrated, leading to ineffective design development and change processes.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-family: verdana, geneva, sans-serif;\">The BBC reacted to the NAO findings by noting that despite the show&#8217;s current dire viewing figures &#8211; it is at the bottom end of the BARB top 20 Ratings while <em>Emmerdale<\/em> and <em>Coronation Street<\/em> continue to dominate the top ten &#8211; <em>&#8216;EastEnders<\/em> celebrated its thirtieth anniversary in 2015 and we are committed to seeing one of BBC One\u2019s biggest shows mark future anniversaries. The drama continues to attract a loyal and diverse audience, including younger viewers. This is a priority for the BBC, supporting our strategy to reinvent the BBC for a new generation.&#8217;<\/span><\/p>\n<blockquote>\n<p style=\"text-align: justify;\">&#8220;We recognise that this complexity has brought challenges, impacting both cost and timelines. The BBC has made many improvements to the programme including across the governance, stakeholder engagement, scheduling and budgeting, as the NAO has acknowledged. We are also pleased that the NAO conclude that the benefits remain achievable.&#8221; &#8211; BBC Statement<\/p>\n<\/blockquote>\n<div dir=\"ltr\">\n<h4>Then and Now:<\/h4>\n<\/div>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-122495\" src=\"http:\/\/www.atvtoday.co.uk\/wp-content\/uploads\/2013\/07\/market-lanes-1.gif\" alt=\"\" width=\"874\" height=\"339\" \/><\/p>\n<div dir=\"ltr\">\n<h5><em>Same backlot four decades apart: Honey Lane Market with its <\/em>three story<em> buildings which included the Forum Theatre, flats and garage while Walford&#8217;s Bridge Street has its newsagents, laundrette and railway bridge.<\/em><\/h5>\n<h5><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-122497\" src=\"http:\/\/www.atvtoday.co.uk\/wp-content\/uploads\/2013\/07\/pubs-1.gif\" alt=\"\" width=\"874\" height=\"339\" \/><\/h5>\n<h5><em>The Duchess of Verona stands in a spot at Elstree not far from where <\/em>the Queen<em> Victoria currently resides.<\/em><\/h5>\n<h5><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-122498\" src=\"http:\/\/www.atvtoday.co.uk\/wp-content\/uploads\/2013\/07\/booze-1.gif\" alt=\"\" width=\"874\" height=\"339\" \/><\/h5>\n<h5 style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-122502\" src=\"http:\/\/www.atvtoday.co.uk\/wp-content\/uploads\/2018\/12\/clean.gif\" alt=\"\" width=\"874\" height=\"339\" \/><\/h5>\n<h5 style=\"text-align: center;\"><em>Honey Lane also had <\/em>a bookies<em>, supermarket and saucy sex shop and stripper club, which Dot Branning wouldn&#8217;t approve of&#8230; EastEnders has its laundrette which is the only place you&#8217;ll find anything dirty in Albert Square. Both at one time had a gents <\/em>hair dressers<em> too.<\/em><\/h5>\n<h5><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-122499\" src=\"http:\/\/www.atvtoday.co.uk\/wp-content\/uploads\/2013\/07\/cafe-1.gif\" alt=\"\" width=\"874\" height=\"339\" \/><\/h5>\n<h5><em>Honey Lane Caf\u00e9 and Bridge Street Caf\u00e9, both home to good food and plenty of arguments.<\/em><\/h5>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The Beeb&#8217;s low-rating saga is having a high spending spree as the Albert Square replacement will cost \u00a327 million more than planned.<\/p>\n","protected":false},"author":1,"featured_media":104596,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"pagelayer_contact_templates":[],"_pagelayer_content":"","footnotes":""},"categories":[3],"tags":[],"class_list":["post-122435","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-soapworld"],"_links":{"self":[{"href":"https:\/\/atvtoday.co.uk\/newsarchive\/wp-json\/wp\/v2\/posts\/122435","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/atvtoday.co.uk\/newsarchive\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/atvtoday.co.uk\/newsarchive\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/atvtoday.co.uk\/newsarchive\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/atvtoday.co.uk\/newsarchive\/wp-json\/wp\/v2\/comments?post=122435"}],"version-history":[{"count":0,"href":"https:\/\/atvtoday.co.uk\/newsarchive\/wp-json\/wp\/v2\/posts\/122435\/revisions"}],"wp:attachment":[{"href":"https:\/\/atvtoday.co.uk\/newsarchive\/wp-json\/wp\/v2\/media?parent=122435"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/atvtoday.co.uk\/newsarchive\/wp-json\/wp\/v2\/categories?post=122435"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/atvtoday.co.uk\/newsarchive\/wp-json\/wp\/v2\/tags?post=122435"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}